Project

PROJECT NAME :

PROVISION OF MANPOWER SUPPLY & OTHER RELATED SERVICES

CLIENT :
PBJV GROUP

END USER :
PETRONAS CARIGALI SDN BHD

YEAR :
2017

Scope of Work:

Provision of manpower supply & other related services for Utilities, Interconnecting, Offsite (U10) Facilities, Procurement, Construction and Commissioning (PCC) Of Underground Pressured Non-Mantellic Piping -Firewater Network Eastside (Package 14-0701).

PETROMAS will be responsible on the following services:-
• Piping Stress Engineer
• Ceaser II Software

Activities during execution of manpower supply services including the following: –

  1. Preparation of stress critical line list
  2. Modeling analysis and evaluation of critical lines
  3. Perform stress check for revise routing of pipe
  4. Review revised routing of pipe based on site condition
  5. Check thrust block for very line
  6. Advise new location and size of thrust block of required
  7. Revised/resize/redesign thrust black details as construction requirement
  8. Stress check based on appropriate design code and project requirement
  9. Design of engineer support details for above ground piping system

PROJECT NAME :

PROVISION OF MANPOWER SUPPLY & OTHER RELATED SERVICES

CLIENT :
PBJV GROUP

END USER :
PETRONAS CARIGALI SDN BHD

YEAR :
2017

Scope of Work:

Provision of manpower supply & other related services for Utilities, Interconnecting, Offsite (U10) Facilities, Procurement, Construction and Commissioning (PCC) Of Underground Pressured Non-Mantellic Piping -Firewater Network Eastside (Package 14-0701).

PETROMAS will be responsible on the following services:-
• Piping Stress Engineer
• Ceaser II Software

Activities during execution of manpower supply services including the following: –

  1. Preparation of stress critical line list
  2. Modeling analysis and evaluation of critical lines
  3. Perform stress check for revise routing of pipe
  4. Review revised routing of pipe based on site condition
  5. Check thrust block for very line
  6. Advise new location and size of thrust block of required
  7. Revised/resize/redesign thrust black details as construction requirement
  8. Stress check based on appropriate design code and project requirement
  9. Design of engineer support details for above ground piping system